国产免费不卡_在线观看毛片网站_欧美金8天国_香蕉视频在线免费看_99re热这里只有精品视频_久久综合久_日韩专区欧美专区

Welcome to Changxing Baodi Environmental Protection Technology Co., Ltd!

中文版 | English
 
Your current position: Home >> Sheet metal atomic grey_ What is sheet metal grey?

Sheet metal atomic grey_ What is sheet metal grey?


 Sheet metal ash (poly putty base), commonly known as putty; also known as unsaturated polyester resin putty. It is a kind of inlay material with rapid development in the world in recent 20 years, which makes the once backward automobile sheet metal repair industry realize a leap of the times. Bh-777 atomic ash, bh-778 atomic ash, bd-777 atomic ash, bd-778 atomic ash and bd-799 atomic ash are refined from unsaturated polyester resin (main raw materials), various fillers and auxiliaries. They are mixed with hardener in a certain proportion. They have the advantages of easy scratch coating, quick drying at room temperature, easy grinding, strong adhesion, high temperature resistance and good matching. They are ideal for surface filling of various substrates Material Science. Sheet metal ash is a kind of convenient and quick two-component new inlay repair material, which is made up of modified resin, pigment, filler, anti settling agent, cobalt salt initiator polymerization inhibitor and curing agent (peroxide) according to the weight ratio of 100:1.5-3. (sheet metal grey is the upgraded version of atomic grey, please pay attention to the screening when purchasing).

 
 
 
Sheet metal grey - Atomic grey
 
 
 
How to use sheet metal ash
 
1. The surface to be scratched must be cleaned of oil, rust, old paint film and moisture, which shall be confirmed to be dry and polished.
 
 
 
2。 The main ash and curing agent should be evenly distributed (100:1.5) to 3 (weight) and the gel time will be used in gel time (the average time of gelation of solar term ash is 5 minutes to 15 minutes). The lower the temperature, the more the curing agent will be used. But generally it should not be greater than 100:3. Sheet metal grey.
 
 
 
3. Use a scraper to scrape the adjusted sheet metal dust on the polished two-component primer or the prepared sheet metal surface. If thick layer is required to be scraped, Z shall be scraped to the required thickness several times. In case of air bubble penetration during coating, it must be completely scraped with a scraper to ensure good adhesion. Generally, 0.5-1 hour after dust scraping is the best wet grinding time for Z (for water grinding and polishing, paint can only be painted after water vapor is completely dry). 2-3 hours is the best dry grinding time. After grinding, remove the dust on the surface, and then spray the intermediate paint, finish paint, varnish and other subsequent operations. For the occasion with high requirements, after the polishing of the sheet metal ash, it is necessary to scrape and apply the fine scraping sheet metal ash (red ash and eye filling ash) to fill up the small defects, then spray the display layer and polish to check the small defects, and then carry out subsequent spraying.


PrevSome misunderstandings in the use of atomic ash
NextSome notes on the use of atomic ash

Copyright © 2020 Changxing Baodi Environmental Protection Technology Co., Ltd all reserved Web Admin --> >>

浙公網(wǎng)安備 33052202000243號(hào)?浙ICP備17019658號(hào)

主站蜘蛛池模板: 欧美日韩国产欧美 | 欧美jizz18性欧美年轻 | 久久九九精品一区二区 | 性做久久久久久坡多野结衣 | 欧美最早期老录像片 | 国产激情视频在线观看首页 | 欧洲亚洲综合一区二区三区 | 国产一级做a爰片在线看免费 | 亚洲日本视频在线观看 | 黄色欧美视频在线观看 | 免费99视频有精品视频高清 | 日本不卡一区二区三区四区 | 九九热精品在线观看 | 欧美一级性视频 | 久久99精品久久久久久噜噜噜 | 久久精品免费观看久久 | 99re6在线精品视频免费播放 | 国产精品亚洲欧美日韩久久 | 青娱极品盛宴国产一区 | 国产成人午夜性a一级毛片 国产成人香蕉 | 国产夫妻精品 | 亚洲日本黄色 | 国产亚洲精品九九久在线观看 | 久久久久久久综合日本亚洲 | 久久涩综合| 国产大片91精品免费观看不卡 | 男女交性过程视频无遮挡在线 | 久草免费福利资源站 | 国产精品久久久久久久久久影院 | 国产在线一91区免费国产91 | 伊人久色| 免费午夜影院 | 精品国产第一页 | 日本有色视频 | 国产亚洲精品日韩综合网 | 国产精品极品美女自在线观看 | 久久精品国产亚洲精品2020 | 欧美激情精品久久久久久不卡 | 韩国最污禁网站免费观看 | 国产美女一级视频 | 国产精品素人福利 |